How to start repair works of the apartment?

The very first stage of the particular repair of old apartments is the particular destruction and dismantling first of just about all in the dilapidated wall space and partition walls, removing the wall and ceiling covering. This stage is one of typically the most “dirty” phases in the repair.

A single more among the most crucial and “dusty” works is the windows block replacement. It is necessary to do this first of all since dirt and dust particles is going to be unallowable throughout following stages in addition to it is prohibited at all to be able to open windows throughout painting and wallpapers works (large falls of the heat and moisture are usually unallowable). After installation windows and windowsills it is required to pack these people immediately in polyethylene film and to be able to cover windowsills inside addition by the fiberboard (in in an attempt to stop scratches).

Painters in London is wiring. Wiring can be mounted in walls or even along the floor. Wiring is made inside the water lines to ensure power safety and enhance reliability. The tube protects wiring from external damages and allows to substitute the wire totally without breaking wall space and floor just by inserting the newest wire instead of the old 1.

House Painting employs the wiring. The frequent mistake throughout the simultaneous performing of such performs occurs when workers forget to place out one of many cabling and house painters have already plastered and smoothed your wall. As a new result, additional works are necessary to seal chases on the finished wall. The particular places of the particular feed switch in addition to wall outlet location and the number need to be thought-out inside advance. The structure of power cabling is usually included into the design task.

Down the road the method must be ready to service in situation of failures. Within addition to the wirings, the phone cable connection and the TV SET cable are presented. The power wire must not be laid out near the mobile phone and antenna cables to avoid noise pickup and interference. The most peculiar second is laying out there the TV cable connection. In order to be able to make two (or three) TV sets in the apartment the other cable is often simply “firmly soldered” in parallel, thus the cable opposition is lowered. As a result, the particular image quality is deteriorated, many programs aren’t be received and etc. In order to avoid such situation it is necessary to request a specialist together with special equipment. This individual will measure the sign level of typically the each TV-feeder in addition to install TV-amplifiers or even TV-filters.

Painting is the most long-term process, for this reason it is performed simultaneously in all premises, when it is feasible. Delays are connected with the technology. Each applied level of the plastsorter (or filling within finishing) must dry out completely prior to the function will continue.

Performs in sanitary arrangements and the kitchen begin simultaneously along with house painting. It is better to fulfill alleged “dirty” works in the first spot and simultaneously. In accordance with the plan of the hygienic technician location welded, wall chasing and pipe run are usually conducted. Steam rad admissions are well prepared, taps and conference are mounted, yet radiators are certainly not installed.

Then works inside sanitary arrangements usually are conducted according to the strategy. The bath is usually mounted, then walls are smoothed away and the ceramic tile is laid on walls. The following stage is putting together ceiling and putting tiles on the particular floor. And at last other hygienic devices, mixers in addition to accessories are attached.

After wiring, unit installation of rosette plates and terminal bins the voltage is usually checked in most level. Ends of electrical wiring are insulated and laid out in to rosette plates. Sockets and breakers aren’t installed during this particular stage in order to save their particular surface appearance. The finish puttying regarding walls is conducted simultaneously. The technologically exact control of drying out of the layer of the plast typer (filling) is taken out by drymeter. It is a special instrument of which measures moisture associated with the material.

The next stage is the particular means of fill. Fill may be made with different materials : from usual brickwork cement-sand mixture in order to self-aligning floors. The particular advantage of the particular simple mixture is its cheapness, typically the disadvantage is of which such mixture will be much harder in-line at the stage and the final dry time regarding such fill is usually 40 days, just then the subsequent stage of typically the work with floor could be conducted, i. e. the time is usually too long. Self-leveling self-aligning floors are more expensive, nevertheless more technological. Aligning occurs almost “automatically” i. e. smooth solution of combination is poured out there, then it operates and you receive the horizontal area. The final dry out time is two weeks i. e. you could have significant time economy. The system “warm floor” is mounted into the fill. In case the so-called “wet processes” are inapplicable the technology regarding the dry aligning (the fill technology) is used angles for floors together with adjustable floor battens are mounted.

After fill door boxes and door usually are installed. Installing of doorways must take directly into the account thickness of future floor covering. After installation the door can be used off its knobs and removed until the end regarding repair or packed into polyethylene movie to protect from damages. Simultaneously threshold could be painted and the tile can be laid for the reason that premises where it was planned. The tile must be set on the absolutely dried out overlay.

Finishing regarding the floor installation depends on the planned covering. In most cases (if finish covering is not the tile) fill is covered by bitumen mastic plus plywood sheets are laid. They usually are fixed to the floor by self-tapping anchoring screws. One plywood linen is fixed simply by 30-50 self-tapping anchoring screws to provide typically the close fixing associated with plywood and long-term service of the floor without squeak and bulging. The particle board gives the additional heat- and traditional acoustic insulation. After increasing of the plywood is finished, wallpaper regarding painting can be pasted on walls.

In premises wherever finish covering associated with the floor is usually laminated flooring or perhaps parquet hoard, the normal wallpapers are pasted (not for painting) in the very first place. Then the particular floor covering is mounted.

If finish addressing from the floor is the block parquet, the parquet is usually laid to start with, after that it is scraped and covered by simply one layer associated with lacquer. After this specific the ordinary wall-papers are pasted plus the parquet is have the rest tiers of lacquer (depending on the quality regarding the parquet plus lacquer). The described consequence is linked only with this kind of scrambling process when the great amount of dust will be created. Despite the particular fact that great floor grinders are usually equipped with the vacuum cleaner, the particular sufficient amount regarding dust is precipitated on surrounding subject matter including walls. Dust particles is very acerbic and is badly washed off. That will is why to be able not to damage wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus moisture it is usually covered by the one layer of ename before wallpaper pasting.

After this the main works could be considered to be able to be finished. It is left only to install the plinths, decorative elements, breakers and sockets, drape holders, to suspend doors, plant-bands and others.

In summary that is necessary in order to note that typically the sequence of functions was listed in general and may change based on the definite situation – typically the number of areas in premise, your own resources, peculiarities associated with the construction associated with the multilevel building. It is dependent on sound judgment and every person able to analysis can individually create such the sequence.